ALLY Energy Professional Profile: SAIR HERNANDEZ
SAIR HERNANDEZ
Reservoir Surveillance Engineer.
Katy, TX, US
Professional Summary
I am experience in the exploration and production of oil and gas as Reservoir Engineer and Production Engineer. Extensive experience on Field Development planning, monitoring, optimization to improve the production of the oil wells and to improve the injection process by gas and water in the field successfully by diagnosing problems and find solutions in the wells. Wide knowledge in enhancing field production, reservoir management, and troubleshooting specific problematic wells with asphaltenes build up and retrograde condensate. Also I evaluate and develop projects for the perforation of new wells and recondition and wells design for Artificial lift as Gas Lift, electric submersible pump and Pumpjack
Experience
EXIAN
Venezuela
Senior Production Engineer.
Apr, 2018 - Dec, 2018

Technical economic analysis of the production potential of the Lagocinco field, through the study of historical data on production, oil and gas reserves, surface facilities, secondary recovery and artificial lifting methods.

PDVSA
Venezuela
Production Engineer
Apr, 2016 - Aug, 2017

• Responsible for optimizing the separation oil, gas, and water, purification of gas and pumping of Flow Station. • Design, management and arrangement of surface networks in Station - wells • Support the development and maintenance of a facility production forecasting model by mass and energy balance models

PDVSA
Venezuela
Reservoir Engeneer
Jul, 2008 - Apr, 2016

•Analyze, design, installation, monitoring, validating and interpreting with a team work of geologist and petro physical, the opportunity to produce oil and gas of the wells, responsible for Reservoir surveillance and optimization of Black oil, condensate and gas and wells by Gas Lift (GL) and Electric Submergible Pump (ESP) AND Pumpjack. • Managing and recommending well service activities as required on several areas such as well cleaning, stimulations, perforating, fracturing operation and re-completions, pressure logging test. • Identify opportunities for a vast range of different fields with wells requiring new completion and work over. Throw study the reservory

Education
Universidad de Oriente
Petroleum Engineer Petroleum Engineer
Sep, 1999 - Apr, 2007

Petroleum Engineer (2007) Universidad de Oriente – Venezuela

Skills
    Awards