Lead Principal Process Engineer on multiple ConocoPhillips Alaska capital projects that included: ? DS2TAM WI Pipeline Coating FEED through Construction ? DS2E PO Pipeline Replacement FEED through Construction ? CPF3 Plant Fuel Gas Modifications FEED through Construction ? CPF3 Fuel Gas Pipeline FEED through Construction ? CPF1 LSEOR Flow Modifications FEED through Construction ? CPF1 Fuel Gas Conversion FEED through Construction ? CPF2 Fuel Gas Conversion FEED ? CPF1 to CPF2 Fuel Gas Conversion FEED ? Beluga River Unit Compression As-Built
Lead Process Engineer responsibilities on multiple Libya National Oil Company (NOC) FEED projects that included: ? WAHA Oil Company El Lateef Field Development Project FEED ? Brega Petroleum Tripoli Main Terminal Project FEED ? Harouge Oil Company Amal Field Fuel Gas Conditioning Project FEED ? WAHA Oil Company Concession 31 Development Proposal ? WAHA Oil Company NC98 & North Gialo Field Development PMC ? Mellitah Oil & Gas Company NC – 118 Field Development Project FEED ? Mellitah Oil & Gas Company Inlet Gas Compressors Proposal ? Zueitina Oil Company 103D Operability and Safety Upgrade Proposal
Principal Process Engineer, various projects ? BP Alaska OTL-28 Pipeline Replacement Project (Prudhoe Bay Alaska) ? BP Alaska OTL-34 Pipeline De-Inventory Project (Prudhoe Bay Alaska) ? BP Alaska C-Pad Corrosion Inhibitor Tanks Replacement (Prudhoe Bay Alaska) ? ConocoPhillips DS1J Pipeline Pigging (Prudhoe Bay Alaska)
Process Engineer responsible for closeout activities on existing offshore GOM projects. Lead Process Engineer on major pipeline expansion project. LOA for 1 year due to death in family.
Senior Process Engineer, Chevron/Chevron Nigeria Limited Olokola Gas Supply Project: Offshore Nigeria Area Lead Process Engineer responsible for pre-FEED and FEED activities for offshore platforms design to supply 10 MMTPA gas to onshore LNG facility.
Area Lead Process Engineer, ConocoPhillips/Chinese National Offshore Oil Company Bohai Phase II Development Project: Bohai Bay, China Responsible for fixed Wellhead Platforms and Drilling EPC interface and design for the FEED phase. (09/03–11/04) Area Lead Process Engineer, ExxonMobil/Hyundai Heavy Industries Kizomba ‘A’ FPSO Project: Offshore Angola Responsible for the detailed engineering phase of the Topsides of a 250 kbpd FPSO. Process representative and lead engineer for entire project through construction and commissioning phases. (08/01–09/03) Area Process Engineer, ExxonMobil Low Sulfur Mogas Project: Baton Rouge, LA (2001) Responsible for development of FEED package. Dupont Alliance, SRW, Orange, TX (1994–2001) Responsible for process engineering to complete conceptual, FEED, and detailed engineering of field/site projects with costs of $6 million and less. Specific projects are listed on resume and supporting documents.
Field Engineer for the Beaumont Expansion Project of the Mobil Oil Refinery. This project was a $400 million expansion and upgrade of the existing refining facility. Responsibilities included P &ID field verification of instrumentation installation which was used to generate status reports for the PTR-4, HDC, Coker, Coker Gas, and SP-2&3 units. These reports that included over 5000 instrument loops were used for manpower scheduling, cost estimation, and trending over the period of construction. I was also a liaison between refinery personnel and contracted employees and was utilized to purchase needed materials from vendors and expedite delivery.